A digital twin for cold storage: forecast-driven energy planning
Predict thermal load. Compare acceptable plans. Explain the recommendation to the dispatcher.
Modelled engineering case. Developed by ITTECHE to analyze architecture and solutions. Company, educational data and calculations; the confirmed result of client implementation is not declared.
Link telemetry to the thermal model being tested and graph calculation. Each recommendation must show the temperature forecast, cost, underlying assumptions, and reason for failure if no acceptable plan is available.
Go to demo
From the business task
to a verifiable solution.
In a model refrigerated warehouse, the temperature depends on the outside air, door openings and plant operation. A regular thermostat sees the current state. The dispatcher needs a forecast: what will happen during unloading and whether it is possible to transfer part of the cooling from expensive watches.
- zone in the training model
- 1
- demo horizon
- 8 hours
- training temperature range
- +2…+6 °C
- graphs for a complete search
- 256
- 01
Check telemetry
Check time, units, sensor calibration and signs of omissions. Missing data is not replaced by the latest temperature without a date stamp.
- 02
Assess condition
The model takes into account the chamber temperature, outside temperature, doors and installation operation. Parameters are determined based on the history of a particular object.
- 03
Compare plans
The optimizer searches for a schedule taking into account the tariff and restrictions. The dispatcher sees the base mode, the proposed plan, and the range of forecast uncertainty.
- 04
Confirm and observe
In the pilot, the system issues recommendations without writing to the controller. The deviation of the fact from the forecast is analyzed, the model version and the solution are saved.
Which plan will withstand the restrictions?
One conditional chamber, initial temperature +4 °C, eight steps of one hour each. The basic thermostat switches on cooling from +4 °C. The calculation goes through 256 schedules and selects the cheapest acceptable one. Tariffs, load and parameters are set for training.
- Basic mode
- 120 ₽ / 8 h
- 20 kWh
- Calculation plan
- 60 ₽ / 8 h
- 20 kWh
- Cost difference
- 60 ₽
- on the same input data
All steps of the plan are in the range of +2…+6 °C. Final temperature: 4.05 °C; in the basic mode - 4.06 °C.
| Hour | Tariff, ₽/kWh | Thermostat | Plan | T basic, °C | Plan T, °C |
|---|---|---|---|---|---|
| 1 | 3 | On | On | 3.11 | 3.11 |
| 2 | 3 | Off | On | 3.77 | 2.27 |
| 3 | 3 | Off | Off | 4.55 | 3.09 |
| 4 | 9 | On | Off | 3.81 | 3.89 |
| 5 | 9 | Off | Off | 4.84 | 4.92 |
| 6 | 9 | On | Off | 4.25 | 5.82 |
| 7 | 3 | On | On | 3.42 | 4.95 |
| 8 | 3 | Off | On | 4.06 | 4.05 |
The cost difference only applies to this calculation. Shifting cooling to cheaper clocks can reduce the bill without reducing kWh consumption. The savings of a real object are determined after measurements.
Formula, parameters and calculation limits
Model of one thermal unit: T is as follows = T + 0.025 × (25 − T) + heating from doors − 1.5 × u. Step - 1 hour; u = 1 when cooling is on, otherwise 0. Outside temperature - +25 °C, electrical power of the installation - 5 kW. The coefficients are conditional and not obtained by equipment calibration.
Door heating by hour: 0.08; 0.12; 0.25; 0.25; 0.5; 0.4; 0.15; 0.1 °C per step; in the mode of frequent openings, the values are multiplied by 3. Conditional tariff: 3; 3; 3; 9; 9; 9; 3; 3 ₽/kWh. The plan is checked at each hourly step and should not end warmer than the baseline. For the same cost, less energy consumption is chosen.
The model does not take into account product temperature, defrost, starting losses and compressor switching limitations. Controlling a real camera requires a proven model, prediction intervals, and hardware constraints. This page does not send commands to the hardware.
From measurement -
to an explicable action.
- 01
Sensors/SCADA
Temperature, doors, energy meter and unit status with time stamps.
- 02
Series of measurements
Data quality control, units and latency; separating gaps from normal values.
- 03
Model and forecast
Estimation of heat gain, verification of parameters and residual error on a delayed period.
- 04
Plan and dispatcher
Cost, limitations, comparison with baseline and confirmation of recommendation.
Infrastructure, storage and integration periods are clarified during the survey. The event's identifier, time, source data, model version, and decision are saved.
The difficulty lies in the conditions
errors and verification.
Model with limits of applicability
An exact fit to last week does not guarantee a forecast under different weather, load or door conditions.
- Solution
- Check parameters for individual periods and note modes outside the studied range. For a complex object, separate air, goods and fences.
- How to check
- Forecast error across horizons, door opening bias, and the proportion of actual values outside the forecast range.
Honest comparison base
A cheap schedule may simply leave the chamber warmer at the end of the calculation or shift the costs over the horizon.
- Solution
- Compare the same load, tariff and initial state. Limit final temperature; check energy, power and cost separately on site.
- How to check
- In the training calculation, the final temperature of the plan is not higher than the final temperature of the base mode. Saving money is not reported as saving kWh.
No data - no recommendation
An expired sensor can make a mathematically valid plan unsuitable for a real object.
- Solution
- Block a new plan if the quality of telemetry is violated. The existing local regulator continues to operate independently of the analytical service.
- How to check
- Artificial loss of connection, time desynchronization and lack of a valid solution. Hardware protections and operating rules retain priority.
What needs to be confirmed
on real data.
Separate calibration and verification
The parameters are estimated on one part of the history, the forecast is checked on another, maintaining the time order. Seasonal and abnormal conditions are considered separately.
Compare at the same load
For the pilot, the base, the method of normalization for weather and cargo turnover, as well as the boundaries of the meter are agreed upon. Need kWh, peak power, cost and time out of range.
Recommendations first
The dispatcher checks the plan with the current regime; the reasons for the deviation are recorded. The confirmed effect and acceptable automation conditions appear only after the pilot. A simplified training example is calculated below.
Path from survey to transmission
- 01
Survey and data
Measurement circuit, storage modes, unit limitations, tariff and history quality.
- 02
Model calibration
Heat balance, independently verified forecast and documented assumptions.
- 03
Recommendation pilot
Comparison with basic control without commands in SCADA, evaluation of quality and failures.
- 04
Reception and observation
Effect measurement method, drift signal, blocking regulations and transmission to the dispatcher.
This is a sequence of work, not a promise of a deadline or budget. The assessment comes after checking the source data and integrations.
Where a solution is required
a different approach.
- The range +2…+6 °C is for demonstration purposes only. Operating requirements are determined by the product and technological regulations of the facility.
- The single temperature model does not describe the temperature inside the product, humidity, defrost and chamber heterogeneity.
- The demonstration calculation does not control the equipment and does not confirm the effect of implementation. It shows constraint checking and cost comparison.
Let's start with the data
and acceptance criteria.
For the first discussion the following are useful:
- History of temperatures, doors, power and installation states with units and time.
- Camera layout, hardware specifications and loading modes.
- Acceptable storage modes, hardware limitations and failure regulations.
- Tariff, energy metering limits and dispatcher for checking recommendations.